Marine Lithium Battery Installation Checklist


Detailed pre-installation and commissioning checklist for a boat LiFePO4 electrical system.

Three unbranded lithium battery formats with marine protection, monitoring and cable components on a workshop bench
Illustrative comparison. Normalise stored energy, current limits, documentation, warranty and the supporting installation—not just amp-hours.

Before purchase

  • Daily load audit completed
  • Peak inverter load calculated
  • System voltage chosen
  • Battery kWh chosen
  • BMS continuous current checked
  • BMS peak current checked
  • Battery charge-current limit checked
  • Solar target calculated
  • Alternator strategy chosen
  • Shore charger checked
  • Generator strategy checked
  • Start battery architecture retained or redesigned
  • Battery location inspected
  • Flooding risk assessed
  • Cable runs measured

Protection

  • Main protection selected for available fault current
  • Branch protection selected
  • DC-rated isolators selected
  • Busbar ratings verified
  • Inverter circuit protected
  • Charger circuits protected
  • Cable ampacity verified
  • Voltage drop checked

BMS and alarms

  • High-voltage protection
  • Low-voltage protection
  • High-temperature protection
  • Low-temperature charge protection where required
  • Over-current protection
  • Pre-alarm
  • Audible alarm
  • Visual alarm
  • Charger disable path
  • Load disable path

Commissioning

  • All terminals torqued to specification
  • Cables supported
  • Battery physically restrained
  • Labels fitted
  • Shunt calibrated
  • State of charge synchronised
  • Alternator tested hot
  • Solar tested
  • Shore charger tested
  • Inverter tested at high load
  • BMS alarm tested
  • Emergency isolation procedure documented

Five layersSafety is a chain, not a battery featureA strong enclosure or BMS cannot compensate for a weak link elsewhere in the installed system.
  1. 01DesignLoads, voltage and failure paths
  2. 02ControlCharging limits and BMS logic
  3. 03ProtectionFuses, isolation and conductors
  4. 04EnvironmentHeat, water, salt and restraint
  5. 05ProofCommissioning and records
Practical context

Apply this guidance to your boat

Use this page as one input to a vessel-specific plan. Record the actual equipment, cable runs, charging sources and operating pattern aboard before choosing hardware or changing the installation.

  1. Measure the real load and its operating time instead of relying on a label or a generic boat profile.
  2. Check every proposed current against the battery, BMS, protection, cable and connection limits.
  3. Confirm the result against current manufacturer instructions and the rules that apply to your vessel.

Work out your own numbers